The Terra spacecraft is operating nominally in science mode.
All Terra Remote EOS Operations Center (REOC) activities at Wallops were successfully achieved this week. This includes Tic/Tocs, Alog, SSR replay, SSR playback, ATC load, and NAV load, which were all conducted from the REOC.
Status of Key Upcoming Schedule Milestones:
On 3/29/05, the CAT developer gave a follow-on demo of his GMSEC tool again
with key Flight Operations Team (FOT) members. The previous week, Jamie Pawloski
had given the CAT
developer a flowchart of how he would like CAT to handle procedure 'templates'.
For this demo, a set of CAT rules had been written to accommodate this
flowchart. It is now up to the FOT to test and expand these rules to then
decide if this is a viable approach for emulating online operators/engineers.
The latest MMS patches were made operational this week. Several days of ATC loads were successfully made. Plans are to give the OK on Friday (April 1) for late change generation.
Spacecraft Activities/Anomalies/Issues:
Two Mission Impact Reports (MIRs) occurred this week having to do with the High
Gain Antenna Motor Drive
Assembly (MDA2) BITE failures while in the South Atlantic Anomaly (SAA). During
one of the MIRs, there was data loss of 112 EDUs from MISR. This was because
the MDA2 BITE failure occurred during a science playback. There was no impact
to science objectives and no data loss on the second MIR.
Ground System and Data Processing System Anomalies/Issues:
One MIR occurred this week having to do with the inability to send the initial
command for a MODIS replay. The command did leave GSFC, but was not performed
by spacecraft. Suspect a bit-flip occurred which caused rejection of command.
Subsequent commanding worked as planned and MODIS replay was nominal.
Therefore, there was no impact to science objectives and no data loss. However,
this problem requires further investigation.
1 MIR occurred this week having to do with the prime CRP down during a pass. There was no telemetry on 000 port. Since all objectives had already been met before this problem, a failover to secondary port 100 was not made. A reset of gsips was made along with reconfiguration of erps which restored CRP functionality. No reason is yet known why the CRP went down, but is under investigation.
1 MIR occurred this week having to do with a ground configuration system anomaly where there was a failover to the OPS LAN due to telemetry freezing on the support LAN. This occurred while performing a MODIS replay. Although no data was lost, there were problems recycling the configs. Further investigation is needed.