Terra Weekly Mission Status Update
Weekly Update Archive
October 15 - 21 2004
All Terra Subsystems and Instruments have performed nominally for the past week.
A kick-off meeting was held on Wednesday, October 13, for re-engineering the Terra control
center with automation functionality. A demonstration of the re-engineered TRMM control center
is planned for Monday, October 25. Plans are to re-engineer the Terra control center first,
followed by Aura and Aqua.
Ground System and Data Processing System Anomalies/Issues:
- Three Mission Impact Reports (MIRs) occurred this week having to do
with K-band dropouts all from TDRSS Spare (TDS). This is a common
problem that occurs more frequently (1-2 times per week) this time of
year. In any event, no science data were lost due to replaying
data on the next available TDRSS contact.
- One MIR occurred this week due to a Ground Station Interface Facility
(GSIF) configuration error. The problem was corrected and no science
data were lost.
- The scheduled transition of the ECS contract to the MOMS contract is
planned for January 15, 2005 (Aura launch plus 180-Days). The FOT will
transition on December 20, 2004.